← Back to properties
Site / land Contact for availability

West Teel Road

Maricopa, AZ · Pinal County County

Land with 33.68 acres in Maricopa, AZ.

Property overview

Acreage
33.68 acres
Availability
Contact for availability
Zoning · General zoning
commercial
Zoning · Inside city limits
Yes
Zoning · Municipality
Maricopa
Transportation · Rail access
on_site
Transportation · Nearest rail owner
Union Pacific Railroad
Transportation · Nearest rail line
UP Gila Subdivision
Transportation · Distance to rail
4.080 miles
Transportation · Nearest highway
AZ 202 LOOP
Transportation · Distance to highway
32.530 miles
Transportation · Nearest interstate
I 8
Transportation · Distance to interstate
13.740 miles
Transportation · Nearest airport
Ak-Chin Rgnl (A39)
Transportation · Distance to airport
9.757 miles
Utilities · Electricity available
Yes
Utilities · Electric provider
Electrical Dist No2 Pinal County (AZ)
Utilities · Distance to power line
0.240 miles
Utilities · Distance to substation
0.430 miles
Utilities · Water provider
Santa Rosa Water Company
Utilities · Distance to water service
31732.800 feet
Utilities · Wastewater provider
Santa Rosa Utility Company
Utilities · Natural gas provider
El Paso Natural Gas Co (AZ)
Utilities · Distance to natural gas service
11193.600 feet
Utilities · Telecommunications available
Yes
Utilities · Fiber service
not_available
Utilities · Distance to fiber
2.990 miles
Environmental · Flood zone
X
Environmental · Inside 100-year floodplain
No
Environmental · Inside 500-year floodplain
No
Environmental · Wetlands
no
Environmental · Wetland coverage
0.000 %

Commercial‑zoned land inside Maricopa city limits with paved frontage on West Teel Road and adjacency to the proposed White & Parker regional route, making it a strategic greenfield for market access and future traffic growth. The parcel sits level on well‑drained, permeable soils and shows on‑site rail presence and nearby high‑voltage transmission, offering clear routes for logistics and industrial connections.

This site suits distribution, light manufacturing, agri‑support, or supplier operations that value incentive savings, since it lies in HUBZone, NMTC, and related federal assistance areas. Utilities and transportation infrastructure are partial and runoff easements have been mapped, so developers can move quickly with planned site work and local permitting.

Location