West Shedd Road 4
Eloy, AZ · Pinal County County
Land with 30.61 acres in Eloy, AZ.
Property overview
- Acreage
- 30.61 acres
- Availability
- Contact for availability
- Zoning · General zoning
- industrial
- Zoning · Inside city limits
- Yes
- Zoning · Municipality
- Eloy
- Transportation · Rail access
- no
- Transportation · Nearest rail owner
- Union Pacific Railroad
- Transportation · Nearest rail line
- UP Gila Subdivision
- Transportation · Distance to rail
- 0.750 miles
- Transportation · Nearest highway
- AZ 202 LOOP
- Transportation · Distance to highway
- 42.740 miles
- Transportation · Nearest interstate
- I 10
- Transportation · Distance to interstate
- 0.000 miles
- Transportation · Nearest airport
- Eloy Muni (E60)
- Transportation · Distance to airport
- 10.613 miles
- Utilities · Electricity available
- Yes
- Utilities · Distance to power line
- 0.120 miles
- Utilities · Distance to substation
- 2.220 miles
- Utilities · Water service
- municipal
- Utilities · Water provider
- City Of Eloy (Eloy, AZ)
- Utilities · Distance to water service
- 558.910 feet
- Utilities · Wastewater service
- septic
- Utilities · Distance to wastewater service
- 3139.060 feet
- Utilities · Distance to wastewater service
- 0.595 miles
- Utilities · Natural gas provider
- El Paso Natural Gas Co (AZ)
- Utilities · Distance to natural gas service
- 12988.800 feet
- Utilities · Telecommunications available
- Yes
- Utilities · Fiber service
- not_available
- Utilities · Distance to fiber
- 0.035 miles
- Environmental · Flood zone
- A
- Environmental · Inside 100-year floodplain
- No
- Environmental · Inside 500-year floodplain
- No
- Environmental · Wetlands
- no
Adjacent to Interstate 10 and positioned inside an Opportunity Zone and HUBZone, this industrial PAD site offers strong incentive support for new investment. Utilities and transportation infrastructure are nearby, with municipal water and fiber within short distance, Union Pacific rail under a mile away, and a drive-time map showing regional connectivity.
The site fits distribution, light manufacturing, and supplier operations that plan a greenfield build. Zoning and entitlements are in place, and the property qualifies for multiple federal and state credits. Note there is no direct access road on the undeveloped portion, so users seeking a build-to-suit can move quickly with planned access improvements.