South Hollis Road
Red Rock, AZ · Pinal County County
Land with 522.19 acres in Red Rock, AZ.
Property overview
- Acreage
- 522.19 acres
- Availability
- Contact for availability
- Zoning · General zoning
- industrial
- Zoning · Inside city limits
- No
- Zoning · Municipality
- Red Rock
- Transportation · Rail access
- no
- Transportation · Nearest rail owner
- Union Pacific Railroad
- Transportation · Nearest rail line
- UP Gila Subdivision
- Transportation · Distance to rail
- 4.180 miles
- Transportation · Nearest highway
- AZ 202 LOOP
- Transportation · Distance to highway
- 72.270 miles
- Transportation · Nearest interstate
- I 10
- Transportation · Distance to interstate
- 17.990 miles
- Transportation · Nearest airport
- Pinal Airpark (MZJ)
- Transportation · Distance to airport
- 13.940 miles
- Utilities · Electricity available
- Yes
- Utilities · Distance to power line
- 0.870 miles
- Utilities · Distance to substation
- 4.960 miles
- Utilities · Wastewater provider
- Pinal County Eleven Mile Corner Rd Wwtp
- Utilities · Natural gas provider
- Southwest Gas Corp (LAS VEGAS, NV)
- Utilities · Distance to natural gas service
- 22387.200 feet
- Utilities · Telecommunications available
- Yes
- Utilities · Fiber service
- not_available
- Utilities · Distance to fiber
- 4.660 miles
- Environmental · Flood zone
- A
- Environmental · Inside 100-year floodplain
- Yes
- Environmental · Inside 500-year floodplain
- Yes
- Environmental · Wetlands
- no
- Environmental · Wetland coverage
- 0.000 %
This industrial-zoned parcel stands out for scale and tax advantages, sitting inside a federally designated Opportunity Zone and eligible for New Markets Tax Credit and local abatements. The site already has partial utilities and sits a short drive from Interstate 10, with a Union Pacific strategic rail corridor a few miles away, enabling strong regional logistics options.
This location fits distribution, light- to medium-manufacturing, and supplier operations that need growth room and incentive support. Road upgrades will be needed for heavy traffic, but nearby power transmission, wastewater service, and active incentive programs position the site for accelerated development.