South Big Sky Avenue
Eloy, AZ · Pinal County County
Land with 320.76 acres in Eloy, AZ.
Property overview
- Acreage
- 320.76 acres
- Availability
- Contact for availability
- Zoning · General zoning
- industrial
- Zoning · Inside city limits
- Yes
- Zoning · Municipality
- Eloy
- Transportation · Rail access
- no
- Transportation · Nearest rail owner
- Union Pacific Railroad
- Transportation · Distance to rail
- 14.140 miles
- Transportation · Nearest highway
- AZ 202 LOOP
- Transportation · Distance to highway
- 58.040 miles
- Transportation · Nearest interstate
- I 10
- Transportation · Distance to interstate
- 22.410 miles
- Transportation · Nearest airport
- Eloy Muni (E60)
- Transportation · Distance to airport
- 22.576 miles
- Utilities · Electricity available
- Yes
- Utilities · Distance to power line
- 2.370 miles
- Utilities · Distance to substation
- 6.530 miles
- Utilities · Water available
- Yes
- Utilities · Distance to water service
- 0.000 feet
- Utilities · Wastewater provider
- Pinal County Stanfield Hud Wwtp
- Utilities · Natural gas provider
- Southwest Gas Corp (LAS VEGAS, NV)
- Utilities · Fiber service
- not_available
- Environmental · Flood zone
- X
- Environmental · Inside 100-year floodplain
- No
- Environmental · Inside 500-year floodplain
- No
- Environmental · Wetlands
- no
- Environmental · Wetland coverage
- 0.000 %
A large, level parcel inside Eloy city limits offers industrial zoning and direct adjacency to the Central Main Canal, giving strong water-management and irrigation advantages for industrial or agricultural support uses. The site has finished grading in places, partial utilities on site, paved drainage on the property, and regional high-voltage transmission nearby, making it attractive for users who need utility and water access with room to build.
This site fits distribution, light manufacturing, ag-support, or energy project users seeking a sizable, developable rural location. It sits in a federal Opportunity Zone and qualifies for multiple tax incentives, helping speed financing and development, though expansive clay soils and unpaved access roads mean site engineering and road upgrades will be required.