North Rachael Road
Maricopa, AZ · Pinal County County
Land in Maricopa, AZ.
Property overview
- Availability
- Contact for availability
- Zoning · General zoning
- industrial
- Zoning · Inside city limits
- Yes
- Zoning · Municipality
- Maricopa
- Transportation · Nearest rail owner
- Union Pacific Railroad
- Transportation · Nearest rail line
- UP Gila Subdivision
- Transportation · Distance to rail
- 0.550 miles
- Transportation · Nearest highway
- AZ 202 LOOP
- Transportation · Distance to highway
- 20.880 miles
- Transportation · Nearest interstate
- I 10
- Transportation · Distance to interstate
- 20.050 miles
- Transportation · Nearest airport
- Ak-Chin Rgnl (A39)
- Transportation · Distance to airport
- 13.680 miles
- Utilities · Electricity available
- Yes
- Utilities · Electric provider
- Ak-Chin Electric Utility Authority (AZ)
- Utilities · Distance to power line
- 0.570 miles
- Utilities · Distance to substation
- 1.390 miles
- Utilities · Water service
- municipal
- Utilities · Water provider
- Global Water - Santa Cruz Water Company
- Utilities · Distance to water service
- 7708.800 feet
- Utilities · Wastewater service
- municipal
- Utilities · Wastewater provider
- Global Water - Palo Verde Utilities Co
- Utilities · Telecommunications available
- No
- Utilities · Fiber service
- not_available
- Utilities · Distance to fiber
- 2.540 miles
- Environmental · Flood zone
- AE
- Environmental · Inside 100-year floodplain
- Yes
- Environmental · Inside 500-year floodplain
- Yes
- Environmental · Wetlands
- no
Located in Maricopa city limits with industrial zoning and multiple federal/state incentives, this site offers a strategic cost advantage for companies seeking tax credits and place-based benefits. Union Pacific rail runs within a mile, major highways and regional airports are within a 30–40 minute drive, and a drive-time map shows solid road connectivity to regional markets.
The parcel contains mapped riverine wetlands, ponding and flow hazards, and portions lie in FEMA 100-year flood zones, so remediation and flood mitigation will be required. Partial utilities and existing entitlements speed permitting, making the site a fit for distribution, light industrial, or supplier operations that can absorb site preparation and leverage incentive programs.