← Back to properties
Site / land Contact for availability

North Deer Trail

Maricopa, AZ · Pinal County County

Land with 494.18 acres in Maricopa, AZ.

Property overview

Acreage
494.18 acres
Availability
Contact for availability
Zoning · General zoning
commercial
Zoning · Inside city limits
Yes
Zoning · Municipality
Maricopa
Transportation · Nearest rail owner
Union Pacific Railroad
Transportation · Nearest rail line
UP Gila Subdivision
Transportation · Distance to rail
6.780 miles
Transportation · Nearest highway
AZ 202 LOOP
Transportation · Distance to highway
31.980 miles
Transportation · Nearest interstate
I 8
Transportation · Distance to interstate
14.800 miles
Transportation · Nearest airport
Ak-Chin Rgnl (A39)
Transportation · Distance to airport
20.589 miles
Utilities · Electricity available
Yes
Utilities · Electric provider
Electrical Dist No2 Pinal County (AZ)
Utilities · Distance to power line
0.680 miles
Utilities · Distance to substation
1.690 miles
Utilities · Water available
Yes
Utilities · Water service
well
Utilities · Water provider
Maricopa Mtn Dwid 2 (Maricopa, AZ)
Utilities · Distance to water service
35428.800 feet
Utilities · Wastewater available
Yes
Utilities · Wastewater service
private
Utilities · Wastewater provider
Global Water - Palo Verde Utilities Co
Utilities · Fiber service
not_available
Utilities · Distance to fiber
6.030 miles
Environmental · Flood zone
A
Environmental · Inside 100-year floodplain
Yes
Environmental · Inside 500-year floodplain
Yes
Environmental · Wetlands
yes
Environmental · Wetland area
8.876 acres

North Deer Trail sits inside Maricopa city limits on commercially zoned greenfield land, offering rare scale and strategic entitlement status in a designated growth area. The site ties to paved local roads, nearby high-voltage transmission, rail access within the region, and partial utility and drainage infrastructure, making it practical to plan large projects while accounting for wetlands and gentle slopes.

This parcel suits distribution, light to medium manufacturing, and supplier campuses that need regional logistics and incentive support. Multiple federal and local incentive zones apply, and local planning layers position the site for relatively quick development with public-sector backing.

Location