← Back to properties
Site / land Contact for availability

North Attaway Road 1

Florence, AZ · Pinal County County

Land with 44.7 acres in Florence, AZ.

Property overview

Acreage
44.70 acres
Availability
Contact for availability
Zoning · General zoning
commercial
Zoning · Municipality
Florence
Transportation · Rail access
potential
Transportation · Nearest rail owner
Union Pacific Railroad
Transportation · Nearest rail line
UP Phoenix Subdivision
Transportation · Distance to rail
1.430 miles
Transportation · Nearest highway
AZ 24
Transportation · Distance to highway
21.040 miles
Transportation · Nearest interstate
I 10
Transportation · Distance to interstate
28.960 miles
Transportation · Nearest airport
Coolidge Muni (P08)
Transportation · Distance to airport
17.399 miles
Utilities · Electricity available
Yes
Utilities · Electric provider
Electrical District 4
Utilities · Distance to power line
0.070 miles
Utilities · Distance to substation
2.690 miles
Utilities · Water available
Yes
Utilities · Water service
municipal
Utilities · Water provider
Johnson Utilities, Llc
Utilities · Wastewater service
municipal
Utilities · Wastewater provider
Johnson Utilities, Llc
Utilities · Distance to wastewater service
535.190 feet
Utilities · Distance to wastewater service
0.101 miles
Utilities · Natural gas provider
El Paso Natural Gas Co (AZ)
Utilities · Distance to natural gas service
17846.400 feet
Utilities · Fiber service
not_available
Environmental · Flood zone
X
Environmental · Inside 100-year floodplain
No
Environmental · Inside 500-year floodplain
No
Environmental · Wetlands
no
Environmental · Wetland coverage
0.000 %

A large, level commercial parcel with existing drainage infrastructure and high-voltage power nearby, making it an efficient site for industrial development. Partial utility and transportation infrastructure is already in place, municipal water and sewer lines are nearby, and mapped transmission and distribution lines cross or adjoin the property. The site lies in an incentive zone and Arizona levies no state deed, mortgage, or leasehold taxes, improving project economics.

This site fits distribution, light manufacturing, and supplier or support operations that need development flexibility and strong power access. Last-mile road improvements will be required, so users planning sitebuild or phased development can move quickly with local approvals and infrastructure extensions.

Location