← Back to properties
Site / land Contact for availability

East Cornman Road

Eloy, AZ · Pinal County County

Land with 160.4 acres in Eloy, AZ.

Property overview

Acreage
160.40 acres
Availability
Contact for availability
Zoning · General zoning
commercial
Zoning · Zoning code
Commercial
Zoning · Inside city limits
Yes
Zoning · Municipality
Eloy
Transportation · Rail access
no
Transportation · Nearest rail owner
Union Pacific Railroad
Transportation · Nearest rail line
UP Phoenix Subdivision
Transportation · Distance to rail
2.510 miles
Transportation · Nearest highway
AZ 24
Transportation · Distance to highway
44.690 miles
Transportation · Nearest interstate
I 10
Transportation · Distance to interstate
11.760 miles
Transportation · Nearest airport
Eloy Muni (E60)
Transportation · Distance to airport
5.632 miles
Utilities · Electricity available
Yes
Utilities · Electric provider
Electrical District 4
Utilities · Distance to power line
0.750 miles
Utilities · Distance to substation
1.520 miles
Utilities · Water provider
Arizona Water Company (AZ)
Utilities · Distance to water service
10560.000 feet
Utilities · Wastewater provider
Eloy Wwtf (Eloy, AZ)
Utilities · Natural gas provider
Southwest Gas Corp (LAS VEGAS, NV)
Utilities · Distance to natural gas service
18532.800 feet
Utilities · Telecommunications available
Yes
Utilities · Fiber service
not_available
Utilities · Distance to fiber
5.920 miles
Environmental · Flood zone
X
Environmental · Inside 100-year floodplain
No
Environmental · Inside 500-year floodplain
No
Environmental · Wetlands
yes
Environmental · Wetland area
0.000 acres
Environmental · Wetland coverage
0.000 %

Commercial-zoned greenfield inside Eloy city limits with on-site electrical distribution, making it a practical option for users seeking a large, buildable parcel with reliable power. The site sits a short drive from Interstate 10 and local general aviation service, giving regional truck and air links while remaining surrounded by rural agricultural land for expansion.

This parcel fits distribution, light industrial, and supplier operations that value zoning flexibility and utility access, but plan for road upgrades and off-site water or gas ties. Entitlements are in place and the property sits in incentive zones, easing development and lowering near-term costs.

Location