Apache Tear Road
Superior, AZ · Pinal County County
Land with 106.62 acres in Superior, AZ.
Property overview
- Acreage
- 106.62 acres
- Availability
- Contact for availability
- Zoning · General zoning
- industrial
- Zoning · Municipality
- Superior
- Transportation · Rail access
- on_site
- Transportation · Nearest rail owner
- Azer
- Transportation · Nearest rail line
- Arizona Eastern Railway
- Transportation · Distance to rail
- 17.540 miles
- Transportation · Nearest highway
- US 60
- Transportation · Distance to highway
- 26.070 miles
- Transportation · Nearest interstate
- I 10
- Transportation · Distance to interstate
- 53.750 miles
- Transportation · Nearest airport
- Superior Muni (E81)
- Transportation · Distance to airport
- 0.353 miles
- Utilities · Distance to power line
- 0.540 miles
- Utilities · Distance to substation
- 0.860 miles
- Utilities · Water service
- municipal
- Utilities · Water provider
- Arizona Water Company - Pinal Valley Water System (Water Provider - Phoenix, AZ)
- Utilities · Distance to water service
- 398.210 feet
- Utilities · Wastewater service
- municipal
- Utilities · Wastewater provider
- Superior Wwtf (Superior, AZ)
- Utilities · Telecommunications available
- Yes
- Utilities · Fiber service
- not_available
- Environmental · Flood zone
- AE
- Environmental · Wetlands
- yes
- Environmental · Wetland area
- 2.179 acres
- Environmental · Wetland coverage
- 0.000 %
On-site rail access and direct frontage to Highway 60 give this industrial-zoned land strong logistics options for distribution or supplier operations seeking a rail-to-highway link in the Superior area. Municipal water and wastewater service are nearby, electrical transmission corridors run close, and licensed fixed wireless is reported for basic communications, supporting rapid site hookup where needed.
The site suits heavy or light industrial users and logistics firms that can design around wetlands, shallow bedrock, and existing flow‑hazard easements. It also sits in designated incentive zones, which can lower development costs. Partial utilities and clear transportation links help speed early-stage development.