← Back to properties
Site / land Contact for availability

85658 3

Marana, AZ · Pinal County County

Land with 635.18 acres in Marana, AZ.

Property overview

Acreage
635.18 acres
Availability
Contact for availability
Zoning · General zoning
industrial
Zoning · Zoning code
20,19,10
Zoning · Inside city limits
Yes
Zoning · Municipality
Marana
Transportation · Rail access
potential
Transportation · Nearest rail owner
Union Pacific Railroad
Transportation · Distance to rail
2.100 miles
Transportation · Nearest highway
AZ 202 LOOP
Transportation · Distance to highway
75.340 miles
Transportation · Nearest interstate
I 10
Transportation · Distance to interstate
17.980 miles
Transportation · Nearest airport
Marana Rgnl (AVQ)
Transportation · Distance to airport
15.214 miles
Utilities · Electricity available
Yes
Utilities · Electric provider
Trico Electric Cooperative Inc (AZ)
Utilities · Distance to power line
0.460 miles
Utilities · Distance to substation
1.590 miles
Utilities · Water available
Yes
Utilities · Distance to water service
0.000 feet
Utilities · Wastewater provider
Pinal County Eleven Mile Corner Rd Wwtp
Utilities · Telecommunications available
Yes
Utilities · Fiber service
not_available
Utilities · Distance to fiber
1.920 miles
Environmental · Flood zone
X
Environmental · Inside 100-year floodplain
No
Environmental · Inside 500-year floodplain
No
Environmental · Wetlands
no
Environmental · Wetland area
0.000 acres
Environmental · Wetland coverage
0.000 %

Direct access to high‑voltage transmission and an existing industrial use permit for a solar plant make this site ideal for power generation and heavy industrial users seeking grid interconnection. The parcel sits in an industrial zoning district with partial utilities, drainage improvements, an on‑site CAP water easement, and entitlements in place, reducing early development hurdles.

This location is eligible for federal incentive programs including CMF High Opportunity designations and a noted 48C tax credit, and rail and intermodal links are nearby, making it a fit for manufacturing, light industrial, warehousing, and distribution. The site is positioned for accelerated development, though access roads will need upgrading for full build‑out.

Location