85132 2
Florence, AZ · Pinal County County
Land with 172.38 acres in Florence, AZ.
Property overview
- Acreage
- 172.38 acres
- Availability
- Contact for availability
- Zoning · General zoning
- industrial
- Zoning · Inside city limits
- Yes
- Zoning · Municipality
- Florence
- Transportation · Nearest rail owner
- Union Pacific Railroad
- Transportation · Nearest rail line
- UP Phoenix Subdivision
- Transportation · Distance to rail
- 4.860 miles
- Transportation · Nearest highway
- AZ 24
- Transportation · Distance to highway
- 30.840 miles
- Transportation · Nearest interstate
- I 10
- Transportation · Distance to interstate
- 28.010 miles
- Utilities · Electricity available
- Yes
- Utilities · Electric provider
- Arizona Public Service Company (Phoenix, AZ)
- Utilities · Water available
- Yes
- Utilities · Water service
- well
- Utilities · Water provider
- Town Of Florence (Florence, AZ)
- Utilities · Distance to water service
- 0.000 feet
- Utilities · Wastewater service
- municipal
- Utilities · Wastewater provider
- Town Of Florence (Florence, AZ)
- Utilities · Distance to wastewater service
- 5280.000 feet
- Utilities · Distance to wastewater service
- 1.000 miles
- Utilities · Natural gas available
- Yes
- Utilities · Natural gas provider
- Southwest Gas (Florence, AZ)
- Utilities · Distance to natural gas service
- 5491.200 feet
- Utilities · Telecommunications available
- Yes
- Utilities · Fiber service
- not_available
- Environmental · Flood zone
- A
- Environmental · Inside 100-year floodplain
- Yes
- Environmental · Inside 500-year floodplain
- Yes
- Environmental · Wetlands
- yes
- Environmental · Wetland area
- 1.876 acres
- Environmental · Wetland coverage
- 0.000 %
Located inside Florence city limits with industrial zoning, this level, undeveloped parcel offers direct adjacency to the N‑S Freeway and on‑site utility and transportation infrastructure, giving companies fast highway access and ready power. Multiple high‑voltage transmission lines and local water and wastewater service nearby reduce utility lead time, and the site sits in incentive zones including New Markets Tax Credit qualification, ERP eligibility, and 48C tax credit potential.
This location fits light and heavy manufacturing, distribution, and supplier operations that need highway and bulk power access. Development should account for on‑site washes, flood control and irrigation easements, and freshwater emergent wetlands, while municipal services and local planning support aim to speed project permitting.