← Back to properties
Site / land Contact for availability

85131

Eloy, AZ · Pinal County County

Land with 320.06 acres in Eloy, AZ.

Property overview

Acreage
320.06 acres
Availability
Contact for availability
Zoning · General zoning
industrial
Zoning · Municipality
Eloy
Transportation · Rail access
no
Transportation · Nearest rail owner
Union Pacific Railroad
Transportation · Nearest rail line
UP Gila Subdivision
Transportation · Distance to rail
9.820 miles
Transportation · Nearest highway
US 60
Transportation · Distance to highway
52.800 miles
Transportation · Nearest interstate
I 10
Transportation · Distance to interstate
50.870 miles
Transportation · Nearest airport
Coolidge Muni (P08)
Transportation · Distance to airport
26.821 miles
Utilities · Electricity available
Yes
Utilities · Distance to power line
3.730 miles
Utilities · Distance to substation
5.780 miles
Utilities · Water available
Yes
Utilities · Distance to water service
0.000 feet
Utilities · Wastewater provider
Coolidge - Airport Wwtf (Coolidge, AZ)
Utilities · Natural gas provider
Southwest Gas Corp (LAS VEGAS, NV)
Utilities · Fiber service
not_available
Utilities · Distance to fiber
11.100 miles
Environmental · Flood zone
A
Environmental · Inside 100-year floodplain
Yes
Environmental · Inside 500-year floodplain
Yes
Environmental · Wetlands
no
Environmental · Wetland area
1.115 acres
Environmental · Wetland coverage
0.003 %

Industrial-zoned parcel in Eloy with an active industrial use permit tied to planning for the Cactus solid waste landfill, giving an established entitlement pathway for large-scale industrial or waste operations. Partial utility and transportation infrastructure exist on-site, and major transmission lines and nearby substations make electrical buildout feasible. The tract sits in a CDFI Investment Area and is eligible for the 48C tax credit, and local incentive programs and abatements are available.

This raw, gently sloping desert site fits heavy industrial, waste management, or support/supplier operations that can take on site improvements. Roads and access will need upgrading, but entitlements and county incentive support shorten the timeline to development.

Location