810 South Sunshine Boulevard
Casa Grande, AZ · Pinal County County
Land with 70.69 acres in Casa Grande, AZ.
Property overview
- Acreage
- 70.69 acres
- Availability
- Contact for availability
- Zoning · General zoning
- industrial
- Zoning · Inside city limits
- Yes
- Zoning · Municipality
- Casa Grande
- Transportation · Rail access
- no
- Transportation · Nearest rail owner
- Union Pacific Railroad
- Transportation · Nearest rail line
- UP Phoenix Subdivision
- Transportation · Distance to rail
- 2.400 miles
- Transportation · Nearest highway
- AZ 24
- Transportation · Distance to highway
- 40.640 miles
- Transportation · Nearest interstate
- I 10
- Transportation · Distance to interstate
- 14.720 miles
- Transportation · Nearest airport
- Eloy Muni (E60)
- Transportation · Distance to airport
- 9.146 miles
- Utilities · Electricity available
- Yes
- Utilities · Electric provider
- Electrical District 4
- Utilities · Distance to power line
- 0.290 miles
- Utilities · Distance to substation
- 0.480 miles
- Utilities · Water available
- Yes
- Utilities · Water service
- well
- Utilities · Water provider
- Arizona Water Company (AZ)
- Utilities · Distance to water service
- 4212.140 feet
- Utilities · Wastewater service
- septic
- Utilities · Wastewater provider
- Coolidge Wwtf
- Utilities · Natural gas provider
- Southwest Gas Corp (LAS VEGAS, NV)
- Utilities · Distance to natural gas service
- 12566.400 feet
- Utilities · Telecommunications available
- Yes
- Utilities · Fiber service
- available
- Utilities · Distance to fiber
- 8.990 miles
- Environmental · Flood zone
- X
- Environmental · Inside 100-year floodplain
- No
- Environmental · Inside 500-year floodplain
- No
- Environmental · Wetlands
- no
- Environmental · Wetland coverage
- 0.000 %
The site sits on existing high-voltage transmission infrastructure with an on-site substation and direct access to 230 kV and 500 kV lines, making it rare ready-to-connect land for power generation and energy-intensive industry. It is zoned industrial, lies inside municipal limits, and is cleared, level, and developed with drainage and partial utilities in place. Major interstates are within regional reach and fiber and municipal water sources are available nearby.
This location fits solar, power generation, heavy industrial, and large distribution or warehouse users that need strong bulk power and quick grid interconnection. Local incentive zones and recorded entitlements reduce development friction, positioning the site for rapid project build-out.