731 N Highway 77 Mammoth, AZ 85618
Mammoth, AZ · Pinal County County
Land with 0.43 acres in Mammoth, AZ.
Property overview
- Acreage
- 0.43 acres
- Availability
- Contact for availability
- Zoning · General zoning
- commercial
- Zoning · Inside city limits
- Yes
- Zoning · Municipality
- Mammoth
- Transportation · Nearest rail owner
- Union Pacific Railroad
- Transportation · Distance to rail
- 18.880 miles
- Transportation · Nearest highway
- US 191
- Transportation · Distance to highway
- 131.990 miles
- Transportation · Nearest interstate
- I 10
- Transportation · Distance to interstate
- 45.270 miles
- Transportation · Nearest airport
- San Manuel (E77)
- Transportation · Distance to airport
- 10.818 miles
- Utilities · Electricity available
- Yes
- Utilities · Distance to power line
- 0.180 miles
- Utilities · Distance to substation
- 0.180 miles
- Utilities · Water available
- Yes
- Utilities · Water service
- municipal
- Utilities · Water provider
- Town Of Mammoth (Mammoth, AZ)
- Utilities · Distance to water service
- 51427.200 feet
- Utilities · Wastewater available
- Yes
- Utilities · Wastewater service
- municipal
- Utilities · Wastewater provider
- Mammoth Wwtf
- Utilities · Distance to wastewater service
- 57.540 feet
- Utilities · Distance to wastewater service
- 0.011 miles
- Utilities · Fiber service
- not_available
- Environmental · Flood zone
- X
- Environmental · Inside 100-year floodplain
- No
- Environmental · Inside 500-year floodplain
- No
- Environmental · Wetlands
- no
- Environmental · Wetland coverage
- 0.000 %
Located in Mammoth city limits with commercial zoning and immediate municipal wastewater access, this parcel is positioned for quick conversion from agricultural use to small commercial or service operations. The site has partial utilities in place, a small existing dwelling footprint that can support early occupation, and direct highway frontage for easy customer and truck access.
This site fits light industrial, distribution support, contractor yards, or local retail and supplier uses seeking low-friction buildout and federal/state incentives. Multiple incentive designations, municipal planning support, and nearby utility infrastructure help speed permitting and reduce initial development costs.