← Back to properties
Site / land Contact for availability

620 West Martin Road 1

Coolidge, AZ · Pinal County County

Land with 2.32 acres in Coolidge, AZ.

Property overview

Acreage
2.32 acres
Availability
Contact for availability
Zoning · General zoning
commercial
Zoning · Inside city limits
Yes
Zoning · Municipality
Coolidge
Transportation · Rail access
on_site
Transportation · Nearest airport
Coolidge Muni (P08)
Transportation · Distance to airport
10.382 miles
Utilities · Electricity available
Yes
Utilities · Electric provider
Electrical District 4
Utilities · Distance to power line
1.040 miles
Utilities · Distance to substation
2.920 miles
Utilities · Water available
Yes
Utilities · Water service
municipal
Utilities · Water provider
Arizona Water Company - Pinal Valley Water System (Water Provider - Phoenix, AZ)
Utilities · Distance to water service
28.650 feet
Utilities · Wastewater available
Yes
Utilities · Wastewater service
municipal
Utilities · Wastewater provider
Coolidge - Airport Wwtf (Coolidge, AZ)
Utilities · Distance to wastewater service
18.330 feet
Utilities · Distance to wastewater service
0.003 miles
Utilities · Natural gas provider
El Paso Natural Gas Co (AZ)
Utilities · Distance to natural gas service
4943.950 feet
Utilities · Telecommunications available
Yes
Utilities · Fiber service
not_available
Utilities · Distance to fiber
11.670 miles
Environmental · Flood zone
X
Environmental · Inside 100-year floodplain
No
Environmental · Inside 500-year floodplain
No
Environmental · Wetlands
no

On-site rail access and municipal water and sewer make 620 West Martin Road 1 a strong pick for logistics and light industrial uses. The site is level and partially developed, with multiple constructed local streets for easy truck access and nearby electric infrastructure and transmission substations to support operations. It sits in several incentive zones and is eligible for tax credits, which improves project economics for investors.

This commercial-zoned parcel fits distribution, manufacturing support, and supplier operations that need rail connectivity and utility certainty. Entitlements are in place, lowering permitting friction and positioning the site for rapid development.

Location