← Back to properties
Site / land Contact for availability

320-004-200-230-01

Sandusky, MI · Sanilac County County

Land with 2.62 acres in Sandusky, MI.

Property overview

Acreage
2.62 acres
Availability
Contact for availability
Zoning · Inside city limits
Yes
Zoning · Municipality
Sandusky
Transportation · Nearest rail owner
Huron And Eastern Railway
Transportation · Nearest rail line
Brown City Subdivision
Transportation · Distance to rail
14.350 miles
Transportation · Nearest interstate
I 69
Transportation · Distance to interstate
37.270 miles
Transportation · Nearest airport
Cowley Field (96G)
Transportation · Distance to airport
3.360 miles
Transportation · Nearest port
Harbor Beach 19.7 feet deep
Transportation · Distance to port
44.585 miles
Utilities · Electricity available
Yes
Utilities · Electric provider
Dte Electric Company (Detroit, MI)
Utilities · Distance to power line
0.050 miles
Utilities · Distance to substation
0.510 miles
Utilities · Water service
municipal
Utilities · Water provider
Sandusky, City Of (Sandusky, MI)
Utilities · Wastewater service
municipal
Utilities · Wastewater provider
Sandusky Wwtp (Sandusky, MI)
Utilities · Natural gas provider
Semco Energy Gas Company
Utilities · Telecommunications available
Yes
Utilities · Fiber service
available
Utilities · Distance to fiber
0.000 miles
Environmental · Flood zone
X
Environmental · Inside 100-year floodplain
No
Environmental · Inside 500-year floodplain
No
Environmental · Wetlands
no
Environmental · Wetland coverage
100.000 %

Immediate access to municipal water and wastewater, on-site power nearby, and 1 Gbps fiber make this Sandusky site an operationally ready choice for firms needing reliable services and connectivity. The property sits inside the Sandusky city limits with an established local road network and close electrical substations, and it lies within a CDBG-eligible area with tax credit eligibility, adding development incentives.

Best for light industrial, small commercial, distribution support, or supplier operations that can work around seasonal high groundwater and clay-rich soils. Partial utility infrastructure is in place, so projects can move quickly with local permitting and community support, though subsurface engineering will be needed for foundations and septic.

Location