2600 West Houser Road
Eloy, AZ · Pinal County County
Land with 120.02 acres in Eloy, AZ.
Property overview
- Acreage
- 120.02 acres
- Availability
- Contact for availability
- Zoning · General zoning
- industrial
- Zoning · Inside city limits
- Yes
- Zoning · Municipality
- Eloy
- Transportation · Nearest airport
- Eloy Muni (E60)
- Transportation · Distance to airport
- 2.703 miles
- Utilities · Electricity available
- Yes
- Utilities · Electric provider
- Arizona Public Service Company (Phoenix, AZ)
- Utilities · Water available
- Yes
- Utilities · Water service
- municipal, well
- Utilities · Water provider
- City Of Eloy (Eloy, AZ)
- Utilities · Distance to water service
- 0.000 feet
- Utilities · Wastewater available
- Yes
- Utilities · Wastewater service
- municipal
- Utilities · Wastewater provider
- Eloy Wwtf (Eloy, AZ)
- Utilities · Distance to wastewater service
- 337.480 feet
- Utilities · Distance to wastewater service
- 0.064 miles
- Utilities · Natural gas provider
- El Paso Natural Gas Co (AZ)
- Utilities · Distance to natural gas service
- 6705.600 feet
- Utilities · Telecommunications available
- No
- Utilities · Fiber service
- not_available
- Utilities · Distance to fiber
- 0.387 miles
- Environmental · Flood zone
- AE
- Environmental · Inside 100-year floodplain
- Yes
- Environmental · Inside 500-year floodplain
- Yes
- Environmental · Wetlands
- no
- Environmental · Wetland coverage
- 0.000 %
Sitting inside Eloy city limits in an active industrial park, this site combines industrial zoning with multiple federal and state incentive designations, including Opportunity Zone and New Markets Tax Credit eligibility. The property has direct local road access near Interstate 10, on-site or adjacent electric and municipal water mains, nearby sewer gravity main and drainage improvements, and documented rail and airport links for regional distribution.
This parcel fits distribution, light or heavy manufacturing, and supplier operations that need incentive support and utility access within a growth-oriented corridor. Partial infrastructure is in place and the site is positioned for rapid development under the local Planned Area Development.