← Back to properties
Site / land Contact for availability

2456 Florence-Coolidge Highway

Coolidge, AZ · Pinal County County

Land with 34.88 acres in Coolidge, AZ.

Property overview

Acreage
34.88 acres
Availability
Contact for availability
Zoning · General zoning
commercial
Zoning · Inside city limits
Yes
Zoning · Municipality
Coolidge
Transportation · Rail access
on_site
Transportation · Nearest rail owner
Union Pacific Railroad
Transportation · Nearest rail line
UP Phoenix Subdivision
Transportation · Distance to rail
2.460 miles
Transportation · Nearest highway
AZ 24
Transportation · Distance to highway
26.670 miles
Transportation · Nearest interstate
I 10
Transportation · Distance to interstate
23.960 miles
Transportation · Nearest airport
Coolidge Muni (P08)
Transportation · Distance to airport
8.447 miles
Utilities · Electricity available
Yes
Utilities · Distance to power line
0.150 miles
Utilities · Distance to substation
2.570 miles
Utilities · Water available
Yes
Utilities · Water service
municipal
Utilities · Water provider
Az Water Co - Pinal Valley (Water Provider - Phoenix, AZ)
Utilities · Distance to water service
7.820 feet
Utilities · Wastewater available
Yes
Utilities · Wastewater service
municipal
Utilities · Wastewater provider
Epcor / Johnson
Utilities · Distance to wastewater service
12936.000 feet
Utilities · Distance to wastewater service
2.450 miles
Utilities · Natural gas provider
El Paso Natural Gas Co (AZ)
Utilities · Distance to natural gas service
7708.800 feet
Utilities · Telecommunications available
Yes
Utilities · Fiber service
not_available
Environmental · Flood zone
X
Environmental · Wetlands
no
Environmental · Wetland coverage
0.000 %

Commercially zoned land with direct frontage on Florence-Coolidge Highway and on-site rail access, offering strong multimodal logistics for users needing highway-to-rail connections. Municipal water and wastewater service are available nearby, and multiple high-voltage transmission lines sit within a short distance, supporting industrial power needs.

The site lies inside Coolidge planning boundaries and several incentive zones, including Opportunity Zone and HUBZone, which can lower soft costs and speed approvals. This location fits distribution, light manufacturing, and supplier or support operations that need regional road, rail, and municipal utilities. Partial utilities are in place and the parcel is positioned for timely development with local entitlements and abatements available.

Location