← Back to properties
Site / land Contact for availability

2350 West William Sears Drive

Eloy, AZ · Pinal County County

Land with 313.11 acres in Eloy, AZ.

Property overview

Acreage
313.11 acres
Availability
Contact for availability
Zoning · General zoning
commercial
Zoning · Inside city limits
Yes
Zoning · Municipality
Eloy
Zoning · Inside ETJ
No
Transportation · Rail access
on_site
Transportation · Nearest rail owner
Union Pacific Railroad
Transportation · Nearest rail line
UP Gila Subdivision
Transportation · Distance to rail
2.810 miles
Transportation · Nearest highway
AZ 202 LOOP
Transportation · Distance to highway
45.520 miles
Transportation · Nearest interstate
I 10
Transportation · Distance to interstate
10.000 miles
Transportation · Nearest airport
Eloy Muni (E60)
Transportation · Distance to airport
6.747 miles
Utilities · Electricity available
Yes
Utilities · Water available
Yes
Utilities · Water service
municipal
Utilities · Water provider
City Of Eloy (Eloy, AZ)
Utilities · Distance to water service
0.000 feet
Utilities · Wastewater available
No
Utilities · Wastewater provider
Eloy Wwtf (Eloy, AZ)
Utilities · Distance to wastewater service
11193.600 feet
Utilities · Distance to wastewater service
2.120 miles
Utilities · Natural gas available
Yes
Utilities · Natural gas provider
El Paso Natural Gas Co (AZ)
Utilities · Distance to natural gas service
5033.320 feet
Utilities · Telecommunications available
No
Utilities · Fiber service
not_available
Utilities · Distance to fiber
3.660 miles
Environmental · Flood zone
X
Environmental · Inside 100-year floodplain
No
Environmental · Inside 500-year floodplain
No
Environmental · Wetlands
no
Environmental · Wetland area
0.000 acres
Environmental · Wetland coverage
0.000 %

A vast, level commercial parcel with direct rail adjacency and close access to Interstate 10 makes this site ideal for large-scale logistics or manufacturing users. The land sits inside the Eloy Planned Area Development, has municipal water to the site, nearby electrical distribution, partial utility and drainage improvements, and a gas easement already in place, all of which simplify initial development.

This site fits distribution, light industrial, and supplier operations that need room to expand and seek cost advantages, with local incentive zones and tax abatements available. The surrounding PAD and pro-development municipality position the property for phased buildout and rapid project momentum.

Location