23295 West Clayton Road
Casa Grande, AZ · Pinal County County
Land with 59.21 acres in Casa Grande, AZ.
Property overview
- Acreage
- 59.21 acres
- Availability
- Contact for availability
- Zoning · General zoning
- industrial
- Zoning · Inside city limits
- Yes
- Zoning · Municipality
- Casa Grande
- Transportation · Rail access
- on_site
- Transportation · Nearest rail owner
- Union Pacific Railroad
- Transportation · Nearest rail line
- UP Gila Subdivision
- Transportation · Distance to rail
- 1.530 miles
- Transportation · Nearest highway
- AZ 202 LOOP
- Transportation · Distance to highway
- 35.640 miles
- Transportation · Nearest interstate
- I 8
- Transportation · Distance to interstate
- 9.870 miles
- Transportation · Nearest airport
- Casa Grande Muni (CGZ)
- Transportation · Distance to airport
- 10.235 miles
- Utilities · Electricity available
- Yes
- Utilities · Electric provider
- Electrical District 4
- Utilities · Distance to power line
- 0.110 miles
- Utilities · Distance to substation
- 1.990 miles
- Utilities · Water available
- Yes
- Utilities · Water service
- municipal, well
- Utilities · Water provider
- Arizona Water Company - Pinal Valley Water System (Water Provider - Phoenix, AZ)
- Utilities · Natural gas provider
- El Paso Natural Gas Co (AZ)
- Utilities · Telecommunications available
- No
- Utilities · Fiber service
- not_available
- Environmental · Flood zone
- AE
- Environmental · Inside 100-year floodplain
- Yes
- Environmental · Inside 500-year floodplain
- No
- Environmental · Wetlands
- no
- Environmental · Wetland coverage
- 0.000 %
Direct rail access and industrial zoning on a largely level parcel inside Casa Grande city limits make this site a logistics and industrial workhorse. The property sits in a business park with on-site rail nearby, good highway links to I‑8 and I‑10, municipal water options, local electrical infrastructure, and participation in incentive programs including New Market Tax Credits and tax abatements.
This site fits distribution, light manufacturing, and supplier or support operations that need rail and highway connectivity. Soils are sandy and well drained though shallow excavations and septic fields are somewhat limited, and utilities are partially in place, helping speed planning and entitlement.