← Back to properties
Site / land Contact for availability

2020 North Valley Farms Road

Coolidge, AZ · Pinal County County

Land with 10.225 acres in Coolidge, AZ.

Property overview

Acreage
10.23 acres
Availability
Contact for availability
Zoning · General zoning
industrial
Zoning · Inside city limits
Yes
Zoning · Municipality
Coolidge
Zoning · Inside ETJ
No
Transportation · Rail access
no
Transportation · Nearest rail owner
Union Pacific Railroad
Transportation · Nearest rail line
UP Phoenix Subdivision
Transportation · Distance to rail
4.330 miles
Transportation · Nearest highway
AZ 24
Transportation · Distance to highway
31.390 miles
Transportation · Nearest interstate
I 10
Transportation · Distance to interstate
25.010 miles
Transportation · Nearest airport
Coolidge Muni (P08)
Transportation · Distance to airport
5.120 miles
Utilities · Electricity available
Yes
Utilities · Distance to power line
0.360 miles
Utilities · Distance to substation
3.300 miles
Utilities · Water available
Yes
Utilities · Water provider
Arizona Water Company - Pinal Valley Water System (Phoenix, AZ)
Utilities · Distance to water service
5240.420 feet
Utilities · Wastewater service
septic
Utilities · Wastewater provider
Coolidge - Airport Wwtf (Coolidge, AZ)
Utilities · Distance to wastewater service
41236.800 feet
Utilities · Distance to wastewater service
7.810 miles
Utilities · Natural gas provider
Southwest Gas Corp (LAS VEGAS, NV)
Utilities · Telecommunications available
Yes
Utilities · Fiber service
not_available
Environmental · Flood zone
AO
Environmental · Inside 100-year floodplain
Yes
Environmental · Inside 500-year floodplain
Yes
Environmental · Wetlands
no

Industrial-zoned greenfield inside Coolidge city limits with multiple federal and local incentive eligibilities, including 48C tax-credit tract qualification and Community Development Block Grant coverage. The site combines irrigation and drainage infrastructure, with a documented Florence/CasaGrande Canal crossing the parcel and nearby high-voltage transmission lines for heavy power needs.

This property fits agricultural operations transitioning to light industrial or support uses that can leverage incentive programs and proximity to Coolidge Municipal Airport and regional utilities. Partial utilities and transportation infrastructure are in place, so users can move from planning toward development quickly, though access improvements and easement coordination will be required.

Location