← Back to properties
Site / land Contact for availability

19127 East Big Buck Drive 1

Eloy, AZ · Pinal County County

Land with 37.84 acres in Eloy, AZ.

Property overview

Acreage
37.84 acres
Availability
Contact for availability
Zoning · General zoning
industrial
Zoning · Inside city limits
Yes
Zoning · Municipality
Eloy
Transportation · Rail access
no
Transportation · Nearest rail owner
Union Pacific Railroad
Transportation · Nearest rail line
UP Gila Subdivision
Transportation · Distance to rail
1.250 miles
Transportation · Nearest highway
AZ 202 LOOP
Transportation · Distance to highway
71.110 miles
Transportation · Nearest interstate
I 10
Transportation · Distance to interstate
12.620 miles
Transportation · Nearest airport
Pinal Airpark (MZJ)
Transportation · Distance to airport
16.197 miles
Utilities · Electricity available
Yes
Utilities · Distance to power line
0.150 miles
Utilities · Distance to substation
5.330 miles
Utilities · Wastewater provider
Pinal County Eleven Mile Corner Rd Wwtp
Utilities · Natural gas provider
Southwest Gas Corp (LAS VEGAS, NV)
Utilities · Distance to natural gas service
14203.200 feet
Utilities · Telecommunications available
No
Utilities · Fiber service
not_available
Utilities · Distance to fiber
1.360 miles
Environmental · Flood zone
AE
Environmental · Inside 100-year floodplain
Yes
Environmental · Inside 500-year floodplain
Yes
Environmental · Wetlands
yes
Environmental · Wetland area
2.138 acres
Environmental · Wetland coverage
0.000 %

The site offers industrial zoning inside Eloy city limits with level, developable land and close regional links, including Interstate I‑10 about 1.3 miles away and a Union Pacific mainline roughly the same distance. Partial utilities and a 115 kV transmission line on the parcel reduce upfront infrastructure runs.

This location suits distribution, light manufacturing, or supplier yards seeking low-density, build-to-suit sites with incentive and tax advantages. The parcel is undeveloped but positioned for relatively quick utility extensions and development, and it lies in a pro-growth impact fee area that can help streamline project costs and timing.

Location