19 North Sunshine Road
Casa Grande, AZ · Pinal County County
Land with 112.62 acres in Casa Grande, AZ.
Property overview
- Acreage
- 112.62 acres
- Availability
- Contact for availability
- Zoning · General zoning
- industrial
- Zoning · Municipality
- Casa Grande
- Transportation · Rail access
- no
- Transportation · Nearest rail owner
- Union Pacific Railroad
- Transportation · Nearest rail line
- UP Phoenix Subdivision
- Transportation · Distance to rail
- 2.070 miles
- Transportation · Nearest highway
- AZ 24
- Transportation · Distance to highway
- 40.360 miles
- Transportation · Nearest interstate
- I 10
- Transportation · Distance to interstate
- 14.930 miles
- Transportation · Nearest airport
- Eloy Muni (E60)
- Transportation · Distance to airport
- 9.356 miles
- Utilities · Electricity available
- Yes
- Utilities · Distance to power line
- 0.230 miles
- Utilities · Distance to substation
- 0.770 miles
- Utilities · Water service
- municipal
- Utilities · Water provider
- Arizona Water Company - Pinal Valley Water System (Phoenix, AZ)
- Utilities · Distance to water service
- 4895.770 feet
- Utilities · Distance to natural gas service
- 12144.000 feet
- Utilities · Fiber service
- available
- Utilities · Distance to fiber
- 9.180 miles
- Environmental · Flood zone
- X
- Environmental · Inside 100-year floodplain
- No
- Environmental · Inside 500-year floodplain
- No
- Environmental · Wetlands
- no
- Environmental · Wetland coverage
- 0.000 %
Direct on-site high-voltage transmission lines and nearby 500/230 kV substations give this industrial-zoned parcel exceptional grid access, making it a strong option for power generation, storage, and heavy industrial users that need large electrical capacity. The land is developed, level, and cleared, with paved drainage ditches and culverts in place, and it sits within federal and state incentive programs including New Market Tax Credit and Bank Enterprise Award eligibility.
The site serves developers focused on utility-scale energy projects, grid interconnection, or energy-intensive manufacturing. Road access needs improvement, but proximity to Interstate 10 and local airports supports regional logistics, and local agencies support rapid development.