← Back to properties
Site / land Contact for availability

1751 South Arizona Boulevard

Coolidge, AZ · Pinal County County

Land with 2.52 acres in Coolidge, AZ.

Property overview

Acreage
2.52 acres
Availability
Contact for availability
Zoning · General zoning
commercial
Zoning · Inside city limits
Yes
Zoning · Municipality
Coolidge
Zoning · Inside ETJ
No
Transportation · Rail access
on_site
Transportation · Nearest rail owner
Union Pacific Railroad
Transportation · Nearest rail line
UP Phoenix Subdivision
Transportation · Distance to rail
0.600 miles
Transportation · Nearest highway
AZ 24
Transportation · Distance to highway
32.220 miles
Transportation · Nearest interstate
I 10
Transportation · Distance to interstate
18.720 miles
Transportation · Nearest airport
Coolidge Muni (P08)
Transportation · Distance to airport
9.986 miles
Utilities · Electricity available
Yes
Utilities · Electric provider
Electrical District 4
Utilities · Distance to power line
0.980 miles
Utilities · Distance to substation
2.830 miles
Utilities · Water available
Yes
Utilities · Water service
municipal
Utilities · Water provider
Arizona Water Company - Pinal Valley Water System (Phoenix, AZ)
Utilities · Distance to water service
0.000 feet
Utilities · Wastewater available
Yes
Utilities · Wastewater service
municipal
Utilities · Wastewater provider
Coolidge Wwtf
Utilities · Distance to wastewater service
15.250 feet
Utilities · Distance to wastewater service
0.003 miles
Utilities · Natural gas provider
El Paso Natural Gas Co (AZ)
Utilities · Distance to natural gas service
4678.820 feet
Utilities · Telecommunications available
Yes
Utilities · Fiber service
not_available
Utilities · Distance to fiber
11.910 miles
Environmental · Flood zone
X
Environmental · Inside 100-year floodplain
No
Environmental · Inside 500-year floodplain
No
Environmental · Wetlands
no

Located in Coolidge city limits and inside a designated Opportunity Zone, this commercially zoned parcel combines on-site rail access with municipal water and sewer within a few feet, making it a strong choice for logistics and industrial uses. A four‑lane arterial sits adjacent, and drainage and road improvements are in place, easing site work and connectivity.

This site suits distribution, light manufacturing, or supplier operations that need quick utility hookups and rail‑served options. It also qualifies for federal and regional incentives including NMTC, HUBZone and BEA, and sits in the Coolidge 2025 planning area to support faster permitting and development.

Location