← Back to properties
Site / land Contact for availability

105 W Hayden Ave Mammoth, AZ 85618

Mammoth, AZ · Pinal County County

Land with 0.26 acres in Mammoth, AZ.

Property overview

Acreage
0.26 acres
Availability
Contact for availability
Zoning · General zoning
commercial
Zoning · Inside city limits
Yes
Zoning · Municipality
Tucson
Transportation · Nearest rail owner
Union Pacific Railroad
Transportation · Distance to rail
18.830 miles
Transportation · Nearest highway
US 191
Transportation · Distance to highway
131.990 miles
Transportation · Nearest interstate
I 10
Transportation · Distance to interstate
45.260 miles
Transportation · Nearest airport
San Manuel (E77)
Transportation · Distance to airport
10.813 miles
Utilities · Electricity available
Yes
Utilities · Distance to power line
0.110 miles
Utilities · Distance to substation
0.120 miles
Utilities · Water available
Yes
Utilities · Water service
municipal
Utilities · Water provider
Mammoth, Town Of (Mammoth, AZ)
Utilities · Distance to water service
51638.400 feet
Utilities · Wastewater available
Yes
Utilities · Wastewater service
municipal
Utilities · Wastewater provider
Mammoth Wwtf
Utilities · Distance to wastewater service
20.490 feet
Utilities · Distance to wastewater service
0.004 miles
Utilities · Telecommunications available
No
Utilities · Fiber service
not_available
Environmental · Flood zone
AE
Environmental · Inside 100-year floodplain
No
Environmental · Inside 500-year floodplain
No
Environmental · Wetlands
no

Located in Mammoth city limits with commercial zoning, this site stands out for its program eligibility, including HUBZone and New Markets Tax Credit areas that can lower development costs and support investment. The property already sits on developed land with municipal water and wastewater infrastructure nearby, partial utilities in place, and standard vehicular access via local roads.

This parcel fits small-scale commercial, light industrial, service, or supplier uses seeking a community location with incentive support. With drainage in place and proximity to regional road and rail connections, the site is positioned for rapid permitting and cost‑effective buildout.

Location